Paving Program

The condition of roads is rated using the Pavement Surface Evaluation and Rating (PASER) system. PASER utilizes a 1 to 10 scale to rate the pavement condition, with 10 being a newly constructed surface and 1 being a completely failed surface.

Walker works with the Grand Valley Metropolitan Council (GVMC) to collect PASER data every year on its City Major (Federal Aid) network. Walker utilizes its own funds to have GVMC collect PASER data on the City Local (Non-Federal Aid) network on an as-needed basis, which is typically every 1 to 3 years. During the data collection process, each street segment receives a unique PASER rating.

During the data analysis process, each PASER rating is weighed to account for the number of lanes on each segment. A lane-mile weighted average PASER rating is then calculated for the City Major and City Local networks.

In 2024, Walker’s lane-mile weighted system average PASER rating was 5.8 (see below).

Walker Pavement Conditions 2024

The City of Walker uses PASER ratings to determine which roads will receive funding from our annual road budget (as determined using our Budget Decision Tool). Below is a chart that details what fixes may be used based on the PASER rating a road has received.

PASER Ratings

Scheduled Street Repair:

In the fiscal year of 2025-2026, the City of Walker will mill and repave the following street segments:

  • West Way Woods
    • Shire St. SW – Collindale Ave. SW to End
    • Clydesdale Ct. SW – Shire St. SW to End
    • Arabian Way SW – Shire St. SW to End
  • Arbor Estates
    • Sydney Dr. NW – Leonard St. NW to End
    • Sydney Ct. NW – Sydney Dr. NW to End
    • Avery Dr. NW – Sydney Dr. NW to Macey Dr. NW
    • E Avery Ct. NW – Avery Dr. NW to End
    • W Avery Ct. NW – Avery Dr. NW to End
    • Macey Dr. NW – Kinney Ave. NW to End
  • Old Mission
    • Mission St. NW – Kinney Ave NW to Trinidad Dr. NW
    • Trinidad Dr. NW – Mission St. NW to Granada Dr. NW
    • Sierra Ave. NW – Mission St. NW to End
    • Stark Ave. NW – Mission St. NW to Trinidad Dr. NW
    • Granada Dr. NW – Sierra Ave. NW to Leonard St. NW
    • Granada Ct. NW – Granada Dr. NW to End
  • Bertha St. NW – West River Dr. to City limits
  • Peachridge Ave – 4 Mile Rd to End SB
  • O’Brien Rd. SW – Wilson Ave. to Collindale Ave. 
  • Alpine Ave. NW – 3 Mile Rd. NW to 150’ S of Hillside Dr. NW
  • Weatherford Dr. NW – N Center Dr. NW to Center Dr. NW

 View our interactive 2026 Resurfacing Project map to see each section.